UKWED

Projects in planning

DateWind farmLocationPower (MW)TurbinesMW CapacityAnnual homes equiv*.DeveloperLatitudeLongitude
July 2009 Tom Nan Clach re-submission Highland 2.3 17 39.1 21863 Infinergy   
July 2009 Tom nan Clach re-submission Highland 17 39.1 21863 Infinergy   
June 2009 Dudgeon  168 560 313123 Warwick Energy   
June 2009 Solway Bank Dumfries & Galloway 21 42 23484 RES   
June 2009 Whitelee Phase II extension East Ayrshire 3.6 39 140 78281 Scottish Power 55 41 14N 04 13 43W 
May 2009 Saxby Wold  2.5 18 45 25162 npower renewables   
May 2009 Seamer re-submission North Yorkshire 10 5591 Broadview Energy   
May 2009 Clashindarroch re-submission Aberdeenshire 18 45 25162 Vattenfall 57 22 30N 02 55 58W 
May 2009 Viking Wind Project Shetland Islands 3.6 150 540 301940 Scottish & Southern   
May 2009 Lancaster University Lancashire    
May 2009 Dunoon Argyll & Bute 2.5 20 11183 Infinergy   
May 2009 Hirwaun re-submission Rhondda Cynon Taff 12 36 20129 Pennant Wind Energy Ventures Ltd   
April 2009 Llanbrynmair Powys 2.3 43 98.9 55300 RES   
April 2009 Pigeon Top Co Tyrone 2.3 20.7 11574 TCI Renewables   
April 2009 Ben Aketil extension Highland 2.5 2796 Falck Renewables   
April 2009 Dagenham II London 1118 Ecotricity 51 31 18N 00 09 02E 
April 2009 Three Moors Devon 22 12301 Airtricity   
April 2009 Sixpenny Wood Yorkshire 10 20 11183 Your Energy 47 96 00N 42 74 42W 
April 2009 Yelvertoft Wind Farm Northamptonshire 24 13420 Your Energy   
April 2009 Newlands Wind Farm Cumbria 2.3 6.9 3858 Bolsterstone PLC   
April 2009 Monkwith Resubmission Humberside 3355 Energiekontor   
March 2009 Westfield Lane West Yorkshire 12 6710 Banks Developments 53 39 54N 01 16 35W 
March 2009 Logiealmond Perth & Kinross 14 28 15656 AMEC Wind   
March 2009 Carland Cross Repowering Cornwall 10 20 11183 Scottish Power   
March 2009 Coal Clough Repowering Lancashire 10 20 11183 Scottish Power Renewables 53 44 55N 02 10 03W 
March 2009 Linton Cambridgeshire 16 8946 Enertrag   
March 2009 Smulgedon Co Londonderry 2.3 17.5 9785 Gaelectric   
March 2009 Muirpark Stirling 33 18452 Airtricity   
February 2009 Shephards Down Hampshire 3355 Cornwall Light & Power   
February 2009 Low Spinney Leicestershire 10 5591 Broadview Energy   
February 2009 Swinford Leicestershire 2.5 11 27.5 15377 Nuon Renewables 52 25 33N 01 09 09W 
February 2009 Cheverton Down Re-submission Hampshire 2.5 7.5 4194 Cornwall Light & Power 50 39 14N 01 22 44W 
January 2009 Race Bank  88 620 346672 Centrica Renewable Energy Ltd   
January 2009 Nun Wood Northamptonshire 12 24 13420 npower renewables   
January 2009 Carnedd Wen Powys 2.5 65 195 109034 npower renewables   
January 2009 Ovenden Moor Repowering West Yorkshire 2.3 10 23 12860 E.ON UK Renewables   
January 2009 Bullamoor Yorkshire 2.5 12 6710 Novera   
December 2008 Rothes Extension - Resubmission Moray Natural Power   
December 2008 Palmers Hollow Nottinghamshire 16 8946 Ridgewind   
December 2008 Wingates Northumberland 2.5 12 6710 Novera   
December 2008 Docking Shoal  500 279574 Centrica Renewable Energy Ltd   
December 2008 Todd Hill Northumberland 2.5 10 5591 Novera   
December 2008 Kirkharle Wind Farm Northumberland 24 13420 npower renewables   
December 2008 Crockbaravally Co Tyrone 2.3 6.9 3858 TCI Renewables   
December 2008 Watford Lodge Northamptonshire 2.5 12.5 6989 Volkswind   
December 2008 Hempnall Norfolk 14 7828 Enertrag   
December 2008 Chelker Reservoir Repowering North Yorkshire 2237 Yorkshire Water Services 53 57 34N 01 54 31W 
December 2008 Mullynaveagh Co Tyrone 2.3 4.6 2572 TCI Renewables   
November 2008 Earls Hall Farm Essex 10 5591 npower renewables   
November 2008 Wryde Croft Re-submission Cambridgeshire 12 6710 RES 52 38 12N 00 03 24W 
September 2008 Cowans Law  25 50 27957 Community Windpower   
September 2008 Kildrummy Aberdeenshire 1.3 12 6710 npower renewables   
September 2008 Galson Estate Western Isles Galson Estate   
September 2008 illymorgan Aberdeenshire 0.9 3.7 2069 Community + Burnetts   
September 2008 Hampole South Yorkshire 10 5591 npower renewables   
September 2008 Mynydd y Gwair Swansea 19 38 21248 npower renewables   
September 2008 Black Law Extension West Lothian 23 69 38581 Scottish Power 55 46 01N 03 44 20W 
September 2008 Hare Hill Extension East Ayrshire 0.85 35 30 16774 Scottish Power 55 20 52N 04 07 47W 
September 2008 Wear Point Wind Farm Pembrokeshire 2.5    
September 2008 Baile an Truseil Wind Energy Project Western Isles 0.9 2.7 1510 Urras Oighreahd Ghabhsainn   
August 2008 Beinn Greidaig  Point & Sandwick Power   
August 2008 Severn Road Gloucestershire 3355    
August 2008 Brightenber Hill North Yorkshire 2.5 12.5 6989 Energiekontor   
August 2008 Auchencorth Moss Midlothian 2.5 18 45 25162 E.ON UK Renewables 55 47 10N 03 17 07W 
August 2008 Merthyr Common Merthyr Tydfil 20.7 11574 Bheara   
August 2008 Crook Hill Lancashire 12 36 20129 Coronation Power 53 41 01N 02 07 52W 
August 2008 Crook Hill Resubmission Lancashire 16 8946 Coronation Power 53 41 01N 02 07 52W 
August 2008 Llaithddu  33 66.7 37295 RPS / Fferm Wynt   
July 2008 Davidstow Community Windfarm Cornwall 2.5 20 50 27957 Community Windpower   
July 2008 Stallingborough Lincolnshire 3355 Aeolian Stallingborough Ltd 52 16 71 E 41 35 46 N 
July 2008 Silton Wind Farm Dorset 12 6710 Ecotricity   
July 2008 Maer Hill Staffordshire 4473 Claymoss Properties Limited 37 75 38 E 33 97 57 N 
July 2008 Cotton Farm Cambridgeshire 16 8946 npower renewables   
July 2008 Kiln Pit Hill Northumberland 12 6710 npower renewables 54 53 36N 01 56 15W 
July 2008 Westnewton Wind Farm Cumbria 2.5 7.5 4194 Broadview Energy   
June 2008 Earlshaugh Scottish Borders 36 108 60388 Wind Energy Ltd   
June 2008 Garreg Lwyd Hill Powys 24 48 26839 RES   
June 2008 Bradwell on Sea Essex 1.5 10 15 8387 npower renewables   
June 2008 South Sharpley County Durham 1.8 7.2 4026 Cornwall Light & Power 43 82 00E 54 88 00N 
May 2008 Burton Pidsea Wind Farm South Yorkshire 5032 Aeolian Holderness Ltd 52 44 19 E 42 97 25 N 
May 2008 Dorenell - originally known as Scaut Hill Wind Farm Moray 59 177 98969 Infinergy   
May 2008 Llandinam repowering Powys 42 96 53678 Scottish Power/Eurus Energy 52 26 11N 03 24 49W 
May 2008 Spicer Hill South Yorkshire 10 5591 JG Pears Ltd 53 31 55N 01 40 10W 
May 2008 Sheephouse Heights Yorkshire 15 8387 Evelop UK   
May 2008 Benington wind farm Hertfordshire RH Bott and Son N51 52 47 W0 06 57 
May 2008 Grange (Flixborough) Lincolnshire 14 7828 Wind Prospect / Ridgewind   
May 2008 Cappagh Co Tyrone 5032 Gaelectric   
May 2008 Durran Mains Caithness 13 19.5 10903 Scottish & Southern   
May 2008 Hawthorn County Durham 2.5 7.5 4194 SLP Energy 54 48 32N 01 22 00W 
April 2008 Humber Gateway Humberside 70 300 167745 E.ON UK Renewables 53 37 00N 00 16 00E 
April 2008 Mynydd Clogau Extn Powys 0.85 19 16 8946 Novera 52 34 49N 03 25 59W 
April 2008 Hammars Hill Highland 0.9 4.5 2516 Hammars Hill Energy Ltd   
April 2008 Mullaghturk Co Londonderry 1.3 9.1 5088 M&B Quinn Ltd 54 41 22N 07 04 40W 
April 2008 Waun Garno Powys 1.5 11 16.5 9226 Acciona Energy UK Ltd   
March 2008 Alaska Wind Farm (Masters Pit) Dorset 2.3 9.2 5144 Infinergy   
March 2008 Clashnarae (Kildrummy) Aberdeenshire 1.5 12 6710 npower renewables   
March 2008 Kilchattan Argyll & Bute 0.85 16 13 7269 Wind Prospect / Ridgewind   
March 2008 French Farm Cambridgeshire 2.5 2796 Cornwall Light & Power 52 39 50 N 00 06 04 W 
March 2008 Dooish Omagh 2.3 17 39.1 21863    
March 2008 Meenakeeran Co Tyrone 24 13420 Northern Wind Power   
March 2008 Teiges Co Fermanagh 2.5 12.5 6989 DW Consultancy   
March 2008 Tillymorgan Aberdeenshire 0.9 3.7 2069 Community + Burnetts   
February 2008 Cemmaes 3 Powys 1.5 12 18 10065 Acciona Energy UK Ltd 52 39 39N 03 39 20W 
February 2008 Hook Moor West Yorkshire 2.5 10 5591 Banks Developments   
February 2008 Stacain Argyll & Bute 14 42 23484 Wind Prospect 56 24 01N 04 59 05W 
February 2008 Cushnie Aberdeenshire 21 11742 RDC and Falck Renewables   
February 2008 Tallentire Hill Cumbria 12 6710 RES   
February 2008 Gorsedd Bran Denbighshire 13 35 19570 Tegni   
February 2008 Lisnamuck Co Londonderry 3355 TCI Renewables   
February 2008 Crockbrack Co Tyrone 5032 Gaelectric   
January 2008 Nigg Hill Highland 10 5591 Falck Renewables   
January 2008 Corby Knowe Co Antrim 3914 Gaelectric   
January 2008 Hirfynydd Neath Port Talbot 1.5 14 21 11742 Acciona Energy UK Ltd 51 44 19N 03 43 16W 
January 2008 Slieveglass Co Tyrone 2.3 6.9 3858 DW Consultancy   
January 2008 Earlsburn extension Stirling 20 11183 RDC 56 05 00N 04 05 00W 
January 2008 Inishative Omagh 21 11742 Gaelectric   
January 2008 A&P Tyne Tyne & Wear 1118 Wind Direct 54 59 04N 01 31 00W 
December 2007 Bleak House Staffordshire 6.9 3858 Harworth Power   
December 2007 Ballindalloch Muir Stirling 2.3 20 11183 npower renewables   
December 2007 Calliachar resubmission Perth & Kinross 14 28 15656 Calliachar Ltd 56 33 59N 03 50 02W 
December 2007 Cregganconroe Co Tyrone 21 11742 Gaelectric   
December 2007 Llanbadarn Fynydd Powys 17 59.5 33269 Nuon Renewables 52 23 49N 03 19 53W 
December 2007 Callagheen Extension Co Fermanagh 13 26 14538 RES Ltd and B9 Energy 54 26 18N 08 00 30W 
December 2007 Dunmore Co Londonderry 24 13420 TCI Renewables   
December 2007 Brockaghboy Co Londonderry 20 60 33549 TCI Renewables   
December 2007 Dunbeg Co Londonderry 14 42 23484 Gaelectric   
December 2007 Farkland Co Londonderry 17 51 28517 Ted Walsh   
November 2007 Wandylaw Moor Northumberland 10 30 16774 Ridgewind   
November 2007 Bettyhill Highland 2.5 2796 North British Wind Power 582951  
November 2007 Clunahill Co Tyrone 2.5 17.5 9785 Northern Wind Power   
November 2007 HE Hall Kent 1118 Wind Direct 51 09 18N 00 27 45W 
November 2007 Wadlow Wind Farm Cambridgeshire 2.3 13 29.9 16719 RES 55 83 25 35 
November 2007 Blaen Bowi Extension Carmarthenshire 1.3 3.9 2181 Windjen Power Ltd 51 59 17N 04 26 43W 
October 2007 Mynydd Waun Fawr Powys 2.5 16 40 22366 Nuon Renewables 52 38 05N 03 27 51W 
October 2007 Shantavny Scotch Co Tyrone 14 7828 Tyrone wind Energy Ltd   
October 2007 Aultmore II Moray 2.3 13 30 16774 Vattenfall   
October 2007 Gronan Co Tyrone 15 34.5 19291 DW Consultancy   
October 2007 Tullywhisker Co Tyrone 3355 Tyrone wind Energy Ltd   
October 2007 Bagot's Park re-submission Staffordshire 2.3 18.4 10288 Airtricity   
September 2007 Carn Hill Co Antrim 21 11742 Gaelectric   
August 2007 Fallago Rig Scottish Borders 48 144 80517 North British Wind Power 55 49 37N 02 39 50W 
August 2007 Corriegarth Estate Highland 20 North British Wind Power   
August 2007 Berrier Hill Cumbria 2.5 22.5 12581 West Coast Energy Developments   
August 2007 Tirgwynt Montgomeryshire 22 44 24603 RDC 52 35 37N 03 29 39W 
August 2007 Ladymoor Ayrshire 24 48 26839 Wind Hydrogen Ltd   
July 2007 Wings Law Ayrshire 24 48 26839 Wind Hydrogen Ltd   
July 2007 Trane Renewable Energy Park Rhondda Cynon Taff 0.85 14 11.9 6654 Gamesa 51 35 43N 03 27 50W 
June 2007 Fairfield Farm Cumbria 1.3 6.5 3634 Wind Prospect 54 34 25N 03 31 31W 
June 2007 Hendraburnick Cornwall 4473 Ecotricity   
June 2007 Andershaw South Lanarkshire 14    
May 2007 Hill of Stroupster Highland 12 24 13420 npower renewables   
May 2007 Koram Hill Co Tyrone 13.8 7716 William Doherty Construction Lyd   
May 2007 Spittal Hill Highland 30 141 78840 Baillie   
April 2007 Broombank Farm Highland 1118 Broombank Farm 57 34 47N 03 47 38W 
April 2007 Morefield Industrial Estate Highland 0.01 0.02 11 Invisible Heating Systems 57 54 22N 05 09 43W 
April 2007 Harelaw Renewable Energy Park East Ayrshire 40 80 44732 Gamesa 55 44 11N 04 25 44W 
April 2007 Greenscares Plantation Perth & Kinross 4473 Eco2   
February 2007 Reaps Moss, Britannia Lancashire 12 6710 Coronation Power 53 41 56N 02 09 38W 
February 2007 ASDA depot, New Bankside Industrial Estate North Lanarkshire 1677 Asda   
February 2007 Green Rigg Northumberland 18 36 20129 Wind Prospect 55 07 56N 02 08 64W 
February 2007 Swaffham II Extension Norfolk 12 6710 Ecotricity 52 39 44N 00 42 11E 
February 2007 Todmorden Moor West Yorkshire 15 8387 Coronation Power 53 43 01N 02 09 38W 
February 2007 Strathy North Highland 2.3 35 80 44732 Scottish & Southern   
February 2007 Lisglass Co Antrim 1677 TCI Renewables   
January 2007 Langham Lincolnshire 12 6710 npower renewables 53 15 17N 00 17 04E 
January 2007 Doon Hill Dumfries & Galloway 2.45 4.9 2740 Windborne 54 58 31N 03 47 49W 
January 2007 Barnbackle Dumfries & Galloway 2.45 4.9 2740 Windborne 55 02 19N 03 46 06W 
January 2007 Greengairs Landfill Site North Lanarkshire 27 15097 Infinis   
January 2007 Altahullion Phase III Co Londonderry 2.5 15 35 19570 RES UK & Ireland Ltd 54 57 38N 07 01 58W 
January 2007 Clondermot Co Londonderry 2.3 2.5 1398 TCI Renewables   
 Birnie Hill  1.5 4.5 2516 Airtricity   
December 2006 East Skichen Farm Angus 1.3 3.9 2181 npower renewables   
December 2006 Cross Moor Devon 2.5 2796 Devon Light & Power 51 003 6N 03 41 29W 
December 2006 Glenconway Co Londonderry 2.3 13 30 16774 Airtricity   
December 2006 Rathsherry Co Antrim 16 36.8 20577 Wheelhouse Energy   
December 2006 Ballyreagh / Tempo Co Fermanagh 0.8 0.8 447 TCI Renewables   
December 2006 Burn of Whilk Highland 13 39 21807 npower renewables   
December 2006 Castlecraig Co Tyrone 2.5 25 50 27957 RES UK & Ireland Ltd 54 62 30N 07 57 50W 
December 2006 Princes Soft Drinks West Yorkshire 1118    
November 2006 Batsworthy Cross Devon 18 10065 npower renewables 50 58 18N 03 41 21W 
October 2006 Meikle Carewe resubmission Aberdeenshire 0.85 12 10.2 5703 RES 57 01 14N 02 17 12W 
October 2006 West Hinkley Resubmission Somerset 18 10065 Your Energy 51 12 14N 03 08 53W 
October 2006 Eshmore Co Tyrone 21 11742 John Gillespie   
October 2006 Millour Hill  18 10065 Community Windpower   
October 2006 Fermanagh Co Fermanagh 0.85    
October 2006 Lieurary Hill Resubmission Highland 2237 Scotrenewables Ltd 58 32 30N 03 35 27W 
September 2006 Ulzieside Dumfries & Galloway 20 40 22366 North British Wind Power   
September 2006 Margree Dumfries & Galloway 17 34 19011 North British Wind Power   
September 2006 Elginny Hill Co Antrim 22 44 24603 Antrim Wind   
September 2006 Maerdy Rhondda Cynon Taff 1.3 10.4 5815 Renewable Energy Partnership   
September 2006 Nutberry Hill South Lanarkshire 2.5 15 8387 RDC 55 34 44N 03 59 32W 
August 2006 Slatbeg Co Tyrone 20.7 11574 DP Energy   
August 2006 Fforch Nest Wind Farm Bridgend 13 39 21807 npower renewables 51 35 58N 03 29 29W 
August 2006 Altgolan Co Tyrone 17.5 9785 Doreen Walker Consulting   
August 2006 Aesica Northumberland 3355 TNEI 55 05 52N 01 37 15W 
July 2006 Sunderland (aka Roos) Humberside 18 10065 RES 52 75 00N 42 95 00E 
July 2006 Inverkip Community Wind Farm  10 30 16774 Community Windpower   
July 2006 Limmer Hill South Lanarkshire 33 99 55356 RDC   
July 2006 Nutsgrove Farm Cambridgeshire 14 7828 Wind Prospect 52 38 08N 00 02 10W 
July 2006 Otterham B Cornwall 0.8 2237 Windelectric Management Ltd   
July 2006 Seegronan Co Tyrone 2.3 20.7 11574 Doreen Walker Consulting   
June 2006 Park Estate (Pairc) Western Isles 26 94 52560 Scottish & Southern   
June 2006 Novartis Renewable Energy Project Lincolnshire 3355 Novartis 53 33 59N 00 04 35W 
June 2006 Moorsyde Northumberland 20 11183 Your Energy 55 41 58N 02 04 46W 
June 2006 Altamooskin Omagh 6.9 3858 Doreen Walker Consulting   
May 2006 Pollnalaght (Pigeon Top) Co Tyrone 2.5 12 30 16774 Doreen Walker Consulting   
April 2006 Steadings Northumberland 21 63 35226 Banks Developments 55 07 35N 02 02 59W 
April 2006 Knoweside South Ayrshire 0.75 15 19.5 10903 Banks Developments 55 22 50N 04 44 14W 
March 2006 Carscreugh Renewable Energy Park Dumfries & Galloway 0.85 18 15.3 8555 Gamesa 54 55 03N 04 45 54W 
March 2006 Gortfinbar Omagh 11.5 24 13420 Doreen Walker Consulting   
March 2006 Pant-y-wal Rhondda Cynon Taff 14 42 23484 Pennant Wind Energy Ventures Ltd   
March 2006 Shira Argyll & Bute 3.6 22 79 44173 Fred Olsen Renewables 56 21 17N 04 58 42W 
February 2006 Dungavel Hill wind farm South Lanarkshire 2.3 13 30 16774 E.ON UK Renewables 55 35 49N 04 05 31W 
January 2006 Grise Cumbria 27 15097 Wind Prospect 54 44 38N 02 54 01W 
January 2006 Crockdun Co Tyrone 2.5 22.5 12581 Northern Wind Power   
December 2005 Glenkirk Aberdeenshire 34 Eurus Energy   
December 2005 Ora More Co Fermanagh 2.3 20.7 11574 RES UK & Ireland Ltd 54 19 57N 07 53 11W 
December 2005 Lochluichart Highland 22 66 36904 Infinergy   
December 2005 Ray Estate Northumberland 16 50 27957 AMEC Wind 55 09 17N 02 00 34W 
October 2005 Cumberhead Forest Complex South Lanarkshire 21 Nutberry Wind Energy Ltd 55 35 29N 03 56 43W 
September 2005 Orby Marsh resubmission Lincolnshire 2.7 20 54 30194 Mark Caudwell 53 10 59N 00 15 57E 
September 2005 Blackcraig, Glenkens Dumfries & Galloway 23 69 38581 Scottish & Southern 55 05 30N 04 06 33W 
August 2005 Aire and Calder wind farm Humberside 15 45 25162 E.ON UK Renewables 53 41 10N 01 01 29W 
August 2005 Lamonby Cumbria 2.3 11.5 6430 E.ON UK Renewables 54 43 13N 02 56 31W 
July 2005 Gruf 2 Orkney 2.5 7.5 4194 Orkney Sustainable Energy 58 56 25N 03 10 29W 
July 2005 Rothes Extension Moray 0.3 28 8.4 4697 Fred Olsen Renewables 57 32 13N 03 22 47W 
July 2005 Bogside Cluster South Lanarkshire 2237 A7 Energy Ltd   
June 2005 Harrow's Law South Lanarkshire 37 111 62066 Scottish & Southern 55 45 40N 03 30 56W 
May 2005 Drumadarragh Co Antrim 3.6 2013 Doreen Walker Consulting 54 47 28N 06 03 01W 
April 2005 Spireslack East Ayrshire 42 59.3 33158 Scottish Coal   
April 2005 Dersalloch East Ayrshire 23 69 38581 Scottish Power 55 19 27N 04 23 49W 
March 2005 Dunbeath Highland 23 69 38581 RDC 58 15 32N 03 30 05W 
March 2005 Dunmaglass Highland 33 99 55356 RES 57 19 46N 04 18 37W 
February 2005 Gortmonly Co Londonderry 2.5 15 8387 Northern Wind Power   
February 2005 Eglish Co Londonderry 2.5 22.5 12581 Northern Wind Power   
January 2005 Broadmeadows Scottish Borders 12 36 20129 Green Power 55 33 53N 02 55 45W 
January 2005 Salsburgh Windco North Lanarkshire 12 24 13420 AB Energy Ltd 55 50 29N 03 52 41W 
January 2005 Tievenameenta Co Tyrone 2.3 15 34.5 19291 Airtricity 54 40 03N 07 40 55W 
 Bower Quarry Highland    
November 2004 Afton East Ayrshire 2.75 27 74 41377 E.ON UK Renewables 55 24 02N 04 10 39W 
November 2004 Waterhead Moor North Ayrshire 40 120 67098 Scottish & Southern 55 49 27N 04 47 14W 
October 2004 Berry Burn Moray 2.75 29 79.75 44592 Force 9 Energy Ltd & Catamount Energy 57 36 35N 03 37 12W 
October 2004 Shawbost & Dalmore Western Isles 2796 Tuscar Technology Ltd 58 19 58N 06 04 11W 
March 2004 Tullinoid Co Fermanagh 15.75 8807 Fermanagh Wind Energy Ltd 54 24 59N 07 48 53W 
March 2004 Ewe Hill Dumfries & Galloway 2.3 22 50.6 28293 Scottish Power 55 10 36N 03 07 27W 
January 2004 Baillie Wind farm - Bardnaheigh Farm Highland 21 63 35226 Baillie 58 02 52N 04 07 40W 
December 2003 Catworth Cambridgeshire 2.3 6.9 3858 E.ON UK Renewables 52 20 53N 00 24 36W 
October 2003 Cambusmore Highland 1.5 33 49.5 27678 RES 57 59 09N 04 16 04W 
September 2003 Timet Site Swansea 0.66 1.98 1107 EnergyTech 51 38 44N 04 00 53W 
April 2003 Minch Moor Scottish Borders 2.3 12 28 15656 AMEC Wind 56 06 34N 03 18 14W 
October 2002 Bu II Extension Orkney 0.9 5.4 3019 Farm Energy 59 04 59N 02 39 53W 
September 2002 WWM Pentre Tump Powys 1.3 3.9 2181 Cornwall Light & Power 52 12 35N 03 10 46W 
June 2002 WWG Cricket St Thomas Somerset 1.3 3.9 2181 Cornwall Light & Power 50 52 05N 02 52 56W 
May 2002 Black Law C South Lanarkshire 2.3 16.1 9002 Scottish Power 55 46 01N 03 44 20W 
December 2001 Eishgen Estate, Beinn Mhor Western Isles 53 159 88905 Beinn Mhor Power 58 01 14N 03 32 25W 
August 2000 Benquhat Hill East Ayrshire 1.3 7.8 4361 Cairnmill Ltd 55 21 52N 04 25 24W 
 Sherford Community Devon    
 Gortgall (Bellmore) Fermanagh 18.4 10288 DP Energy   
 Monan Community Wind Farm Western Isles 2.5 1398 North Harris Trading Company   
 Odd Down Somerset 0.225 0.225 126  51 21 39N 02 22 55W 
 Pen Rhiw Gwaith Farm Monmouthshire 0.3 0.6 335 EnergyTech 51 40 13N 03 11 53W 
 Meall Mhor Argyll & Bute 2.2 1230 Herr Von Pesold 55 55 06N 05 27 47W 
 Barlockhart Wind Farm Dumfries & Galloway 2.5 10 5591 West Coast Energy Developments   
 Blantyre Muir South Lanarkshire 5032    
 Crockagarron Extension Co Tyrone Northern Wind Power   
 Strathy South Highland 77 177 98969 Scottish & Southern   
 Orchard End Resubmission Lancashire Cornwall Light & Power   
 Barmoor South Moor Northumberland 27 15097 Force 9 Energy Ltd & Catamount Energy   
 Queens Elizabeth Hospital Norfolk 0.8 0.8 447 Ecotricity   
 Hareshaw North Lanarkshire    
 Withernwick Humberside 18 10065 Energiekontor   
 Toft Hill Northumberland 21 11742 npower renewables   
 Kitchen Garden Lincolnshire 0.25 0.25 140 EnergyTech   
 Glenbuck II Co Antrim 15 8387    
 Poplar Lane Shropshire 12 6710 Nuon Renewables 52 57 45N 02 25 27W 
 Neslam's Farm Lincolnshire 12 6710 Scottish Power   
 The Hydrogen Office Fife 0.75 0.75 419 The Hydrogen Office   
 Kilbraur extension Highland 20 11183    
    35719698.325422796   

278 records were returned

All figures given are the result of standard BWEA calculations. Specific project information may vary.

*Annual homes equivalent
Over the course of a year, the wind farm would be expected to provide enough electricity to serve this many households. This calculation is based on a capacity factor of 30% and an average household consumption of 4,700 kWh/year.

The accuracy of this number will vary according to the actual capacity factor of the wind farm and the electricity usage in the locality. For example, if most of the houses have gas fired central heating, then the homes equivalent will be higher. Equally, electric heating would result in a lower homes equivalent.

At very good sites the capacity factor can be over 40%. At other sites the capacity factor may be under 30%.

Methodology for these and other benefits can be found at calculations for wind energy statistics.