Offshore Wind
Round 1 Wind Farms

| Location |
Status |
Capacity |
Developer/Turbines |
|
| North Hoyle |
Operating (Dec 2003) |
60 MW |
RWE npower renewables (Vestas 2 MW) |
website |
| Scroby Sands |
Operating (Dec 2004) |
60 MW |
E.ON UK Renewables (Vestas 2 MW) |
website |
| Kentish Flats |
Operating (Sep 2005) |
90 MW |
Vattenfall (Vestas 3MW) |
website |
| Barrow |
Operating (Sept 2006) |
90 MW |
Centrica/DONG Energy(Vestas 3 MW) |
website |
| Gunfleet Sands I |
Operating (April 2010) |
108 MW |
DONG Energy (Siemens 3.6MW) |
website |
| Lynn/Inner Dowsing |
Operating (Mar 2009) |
194.4 MW |
Centrica (Siemens SWT 3.6MW) |
website |
| Cromer |
Withdrawn after approval |
30 turbines |
EDF |
|
| Scarweather Sands |
Withdrawn after approval |
30 turbines |
E.ON UK Renewables/DONG Energy |
|
| Rhyl Flats |
Operating (Dec 2009) |
90 MW |
RWE npower renewables (Siemens 3.6MW) |
website |
| Burbo Bank |
Operational (Oct 2007) |
90 MW |
DONG Energy (Siemens 3.6MW) |
website |
| Robin Rigg |
Operating (April 2010) |
180 MW |
E.ON UK Renewables (Vestas V90 3MW) |
website |
| Shell Flat |
Application withdrawn |
90 turbines |
ScottishPower/Eurus/ Shell/DONG Energy/td>
| |
| Teesside |
Approved (Sep 2007) |
62.1MW |
30 x Siemens 2.3MW turbines |
|
| Tunes Plateau * |
Handed back |
30 turbines |
RES/B9 Energy |
|
| Ormonde * |
Under Construction
(May 2010) |
150MW |
30 x 5MW Repower |
website |
| * These two projects were outside the original Round 1 process but conform to its terms. |
|
|