Round 1 Wind Farms

Location Status Capacity Developer/Turbines

 

North Hoyle Operating (Dec 2003) 60 MW RWE npower renewables (Vestas 2 MW) website
Scroby Sands Operating (Dec 2004) 60 MW E.ON UK Renewables (Vestas 2 MW) website
Kentish Flats Operating (Sep 2005) 90 MW Vattenfall (Vestas 3MW) website
Barrow Operating (Sept 2006) 90 MW Centrica/DONG Energy(Vestas 3 MW) website
Gunfleet Sands I Operating (April 2010) 108 MW DONG Energy (Siemens 3.6MW) website
Lynn/Inner Dowsing Operating (Mar 2009) 194.4 MW

Centrica (Siemens SWT 3.6MW) website
Cromer Withdrawn after approval 30 turbines EDF

 
Scarweather Sands Withdrawn after approval 30 turbines E.ON UK Renewables/DONG Energy  
Rhyl Flats Operating (Dec 2009) 90 MW RWE npower renewables (Siemens 3.6MW) website
Burbo Bank Operational (Oct 2007) 90 MW

DONG Energy (Siemens 3.6MW) website
Robin Rigg Operating (April 2010) 180 MW E.ON UK Renewables (Vestas V90 3MW) website
Shell Flat Application withdrawn 90 turbines ScottishPower/Eurus/ Shell/DONG Energy/td>  
Teesside Approved (Sep 2007) 62.1MW 30 x Siemens 2.3MW turbines  
Tunes Plateau * Handed back 30 turbines RES/B9 Energy
Ormonde * Under Construction
(May 2010)
150MW 30 x 5MW Repower website
* These two projects were outside the original Round 1 process but conform to its terms.