Offshore Wind

Round 1 Wind Farms

Location Status Capacity Developer/Turbines  
North Hoyle Operating (Dec 2003) 60 MW npower renewables (Vestas 2 MW) website
Scroby Sands Operating (Dec 2004) 60 MW E.ON UK Renewables (Vestas 2 MW) website
Kentish Flats Operating (Sep 2005) 90 MW Vattenfall website
Barrow Operating (Sept 2006) 90 MW Centrica/DONG Energy(Vestas 3 MW) website
Gunfleet Sands Under Construction 30 turbines DONG Energy website
Lynn/Inner Dowsing Installed (July 2008) 54 turbines Centrica website
Cromer Withdrawn after approval 30 turbines EDF  
Scarweather Sands Approved 30 turbines E.ON UK Renewables/DONG Energy website
Rhyl Flats Under Construction 25 turbines npower renewables website
Burbo Bank Operational (Oct 2007) 25 turbines DONG Energy (Siemens) website
Robin Rigg Under Construction 60 turbines E.ON UK Renewables website
Shell Flat Application withdrawn 90 turbines ScottishPower/Eurus/ Shell/DONG Energy  
Teesside Approved 30 turbines EDF  
Tunes Plateau * Submitted 30 turbines RES/B9 Energy website
Ormonde * Submitted 30 turbines Eclipse Energy website
* These two projects were outside the original Round 1 process but conform to its terms, Ormonde is an innovative wind-gas hybrid project.